Over 2,500 electric vehicles stranded in Mustang
The vehicles entered Nepal over the past two weeks but have been unable to reach their destinations despite the road reopening on Friday evening, as sections of the route remain difficult to navigate.

Republica · ११ घण्टा अघि
० पटक हेरिएको
मूल प्रतिवेदन: Republica। यो समाचार AllSamachar ले सारांशमा प्रस्तुत गरेको हो। पूर्ण समाचार मूल प्रकाशकको साइटमा पढ्नुहोस्।

