Construction of Bailey bridge at Betrawati raises hope for tourism resurgence in Rasuwa
Ever since the disastrous flood in the Bhotekoshi river in the district on August 26 washed away the bridge over the Phalakhu River, the area has been deserted for almost a month and a half.

Republica · १० घण्टा अघि
० पटक हेरिएको
मूल प्रतिवेदन: Republica। यो समाचार AllSamachar ले सारांशमा प्रस्तुत गरेको हो। पूर्ण समाचार मूल प्रकाशकको साइटमा पढ्नुहोस्।

